Project: DaveBellairs   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1467.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

May 31, 2023     Secondary control cable support - (4 hours)       Category: Engine
Safety wired the two bolts that secure the throttle cable to the engine case. Super tight quarters to get the wire tight. Only took an hour and 3 tries. Installed the subpanel to finalize placement of control cables and location of adel clamps on F-746 fwd angle. Marked location of the cables and drilled, deburred and dimpled for nutplates on F-746 angle. Tweeted the routing of the mixture, prop and alt air cables and tightened the firewall pass throughs to secure the cables. Scuffed the F-746 bracket and primed. Trimmed right portion of subpanel to allow room for the fuel vent.


 